Having got the sand I took the opportunity this weekend to pull up and re-lay all of the slabs so that they’re better laid and also more equally spaced, and more level and equally level to one another etc. Basically I did a bad job first time around. Bottom right photo is before showing the gap, also the level was not very good with the concrete. It’s better now. I’ll let the slabs bed in for a few weeks then probably try to level them better and then I’ll go around and grout them in.
Archives