3 cubic meters of logs cut to between 8 and 10inches long (like the mix of units?) turned up in the back of a tipper. It took me a hour at the time when they turned up (12:00 noon), then another 3/4 hours before we went out (16:00) and another half an hour or so later on (20:00) when we came back to get them all stacked, which was 3 times longer than I hoped it would take to stack them all in.
Archives